Back

Logistics warehouse SPAK

Location
Gallbrunn / Lower Austria
Area
1610m²
Client
Peter SPAK GmbH
Completion
In construction - completion 10/2026

Logistics and warehouse facility for a food producer. Precast concrete structure with insulated panel wall cladding. Glued laminated timber beam span of 38 meters. Fiber-reinforced monolithic floor slab. Partially climate-controlled.